415.898.1400
SRJC

SRJC

SRJC View All Projects PROJECT DETAILS SRJC Santa Rosa, CA WBE Telcom installed a new redundant fiber optic system to support over 30+ buildings. The core of the system is a 288 fiber strand cable that creates a “loop” around the campus. It included 1,728 single mode...
UCOP Modernization

UCOP Modernization

UCOP Modernization Divisions: WBE Telcom Location: Oakland, CA Description For the UCOP Modernization project at 1111 Franklin Street in Oakland CA, WBE Telcom replaced existing Cat.5 cabling with new Cat.6A cabling on nine floors and installed new Fiber Backbone to...
Santa Rosa Junior College

Santa Rosa Junior College

SRJC PROJECT DETAILS SRJC Santa Rosa, CA WBE installed a new redundant fiber-optic system to support over 30+ buildings. The core of the system is a 288 fiber strand cable that creates a “loop” around the campus. It currently includes 1,728 single mode...
San Marin High School

San Marin High School

San Marin High Field Lighting   Division: WBE Traffic Signal & Street Light Division Location: Novato, CA Description: WBE Traffic Division teamed up with BHM Construction on the installation of new (Musco) stadium field lighting for our local San Marin High...
Solano Community College

Solano Community College

Solano Community College Division:W. Bradley Electric, Inc.Location:Fairfield, CAProject Cost:$3,100,000Description:This is a full design-build project for Solano Community College’s new 44,000 sf Science Building. The building will house General Labs, Lecture...