Marin emergency operations facility

PROJECT DETAILS

Marin EOF

San Rafael

182,000 Sq. Ft.

Project Cost: $10,100,000

W. Bradley Electric provided full Design/Build electrical and low-voltage infrastructure services for Marin County’s Emergency Operations Facility. The building supports the Sheriff’s Department, 911 dispatch, the coroner, and multiple county divisions, requiring a fully redundant, highly reliable 24/7 environment.

WBE delivered complete power distribution, redundancy systems, communications cabling, and technology infrastructure across all three floors.

Electrical & Power Systems

  • Full Design/Build electrical installation
  • Electrical and HVAC redundancy throughout
  • Building-wide lightning protection
  • 2-hour UPS backup for 911 dispatch and critical systems
  • New 12kV–480V substation installation
  • Tenant improvements, power distribution, lighting, and system upgrades

Low Voltage & Technology Systems

  • Complete Panduit-based low-voltage cabling system
  • Voice, data, and A/V structured cabling
  • Fiber and copper backbone cabling throughout the facility
  • Server room cabinets, ladder racks, and supporting infrastructure
  • Communications infrastructure for offices, three server rooms, Radio Communications Room, and the 911 Dispatch & Control Center

Sector: Tenant Improvement

Division: Telecom, Electrical

Services: Design-Build, BIM