Google Pacific Shores  Divisions:W. Bradley Electric, WBE TelcomLocation:Redwood City, CAProject Cost:$16,885,000Description:This project consisted of 2 buildings. 1600 Seaport Blvd is a 5 story building (137,000 sq ft) with all new electrical systems, fire alarm,...
Washington Hospital Division:WBE Telcom DivisionLocation:Fremont, CADescription:WBE Telcom installed Cat 6A cabling into this new hospital building. This project consisted of a build out for (9) IDF rooms and (1) server room with Hot Isle containment. WBE Telcom...
PG&E Auburn Divisions:W. Bradley Electric, WBE TelcomLocation:Auburn, CAProject Cost:$8,700,000.00Description:This project is a consolidation of PG&E Auburn’s Rock Creek Yard and Auburn service center to a single location. This 15 acre site will combine...
BioMarin SRCC Division: WBE Telcom Division Location: San Rafael, CA Description: The Telcom installation for BioMarin included 2 buildings totaling 6 floors. The entire project included 6 IDF’s and 1 Server Room. We used a Systimax Solution with a Uniprise...
LinkedIn Division:WBE Telcom DivisionLocation:Mountain View, CAProject Cost:$1,077,000.00Description:LinkedIn required Installation of all Data Infrastructure to 3 Buildings. Each Building has 2 Floors with all cabling terminating on the 2nd floor. Termination style...