UCOP Modernization

UCOP Modernization

UCOP Modernization Divisions: WBE Telcom Location: Oakland, CA Description For the UCOP Modernization project at 1111 Franklin Street in Oakland CA, WBE Telcom replaced existing Cat.5 cabling with new Cat.6A cabling on nine floors and installed new Fiber Backbone to...
Fortinet

Fortinet

Fortinet   Divisions: WBE Electrical Location: Sunnyvale, CA Description: Fortinet’s new headquarters is located at the corner of Kifer Road and Commercial Street in Sunnyvale, California. It is a 172,000 square foot state-of-the-art building with a LEED...
Wilmerhale

Wilmerhale

Wilmerhale   Division: Electrical, Telcom, Audio Visual Location: Palo Alto, CA Description: WBE’s Electrical division completed a buildout of this 40,000 sq ft. building. The project included a mixture of open, grid, and hard lid ceilings with lighting...
MKS Instruments

MKS Instruments

MKS Instruments Division: WBE Telcom Division Location: Milpitas, CA Description: The WBE Telcom team provided and installed Category 6 cable to various lab workspaces and offices. Provided and installed CAT6A cable to WAP locations, and build out of 3 MDF/IDF spaces...
Santa Rosa Junior College

Santa Rosa Junior College

SRJC Division: WBE Telcom Division Location: Santa Rosa, CA Description: WBE installed a new redundant fiber-optic system to support over 30+ buildings. The core of the system is a 288 fiber strand cable that creates a “loop” around the campus. It...