The Pasha Group
PROJECT DETAILS
The Pasha Group
San Rafael, CA
GC: GCI General Contractors
Three of WBE’s divisions worked on this project.
AV Division – Work Description
W. Bradley Electric’s Audio Visual division delivered and installed fully integrated AV solutions across 19 conference rooms, providing complete Microsoft Teams Room functionality. Fifteen standard conference rooms were equipped with Logitech Rally Bar systems, TAP controllers, and Scribe whiteboard cameras. Four larger conference rooms received custom-integrated AV systems featuring ceiling array microphones, ceiling-mounted speakers, Logitech Rally PTZ cameras, TAP controllers, and Scribe whiteboard cameras.
All conference rooms were outfitted with LG commercial displays, including a 110-inch display installed in the training room to support large-format presentations. In addition to conferencing systems, the AV team installed three digital signage displays, including one interactive touchscreen unit, enhancing wayfinding and communication throughout the facility.
Security Division – Work Description
W. Bradley Electric’s Security Division installed, configured, and commissioned comprehensive security systems for Pasha’s new headquarters. The scope included Lenel access control, Verkada video surveillance, intercom systems, visitor management, and Bosch intrusion alarm systems. Our team provided all labor, tools, equipment, cabling, programming, testing, and end-user training, delivering fully integrated and fully operational security systems tailored to the facility’s requirements.
Telecom Division – Work Description
W. Bradley Electric’s Telecom Division provided comprehensive structured cabling and network infrastructure services, including horizontal copper cabling, fiber backbone installation, and IDF/server room buildout. The team installed Category 6 cabling to open office areas, private offices, conference rooms, and wireless access point locations, including termination, labeling, and testing. WBE also installed and grounded data racks, cabinets, ladder rack systems, cable management, patch panels, and fiber enclosures across multiple IDFs and the main server room.
In addition, WBE installed and fusion-spliced single mode fiber backbone cabling between buildings, provided copper and fiber patch cords, performed rack-and-stack services, completed WiFi heat map surveys, and delivered full design documentation, patch mapping, labeling, permitting, inspections, and LEED documentation. All work was performed by BICSI-trained, union technicians and delivered with complete as-built drawings.