by Kim Pearson | Aug 29, 2019
Bon Air Bridge Division:WBE Traffic Signal & Street LightingLocation:Larkspur, CADescriptionThe Bon Air Bridge in Larkspur is being upgraded and WBE’s Traffic Division is responsible for the improvements at the intersections on either sides of the bridge....
by Kim Pearson | Apr 5, 2019
Dublin Signal Wrap Division:WBE Traffic Signal & Street Light DivisionLocation:Dublin, CADescription:Our Traffic division is working along with a subcontractor on three detector loops. This project includes installation of temp cameras at 3 locations, traffic...
by Kurt Neuweiler | Aug 17, 2018
San Ramon Arterial Management Divisions:WBE Traffic Signal/Street Lighting, WBE TelcomLocation:Dublin, CADescription:This project includes the installation of a 96 strand fiber optic cable between signalized intersections along San Ramon Blvd. This cable will be...
by Kurt Neuweiler | Jun 22, 2018
SMART Divisions:WBE Security, WBE TrafficLocation:San Rafael, CADescription:WBE Security designed this project with the assistance of the application engineer from Avigilon. It consists of several multi image 180 and 360 degree cameras on the train platform and...
by Kurt Neuweiler | Mar 12, 2018
Waterfront Park Division: WBE Traffic Signal & Street Light Location: Martinez, CA Project Cost: $1,989,000 Description: The Waterfront Park renovation project includes the demolition of the existing park area and the reconstruction of four new lighted baseball...