GAP Pleasanton

GAP Pleasanton

GAP Pleasanton Division:WBE Telcom, WBE Audio Visual, WBE SecurityLocation:Pleasanton, CADescription:This project was a build out of 2 floors for GAP’s office building in Pleasanton. Each of these floors had exposed ceilings with cable trays routing the...
SMART

SMART

SMART Divisions:WBE Security, WBE TrafficLocation:San Rafael, CADescription:WBE Security designed this project with the assistance of the application engineer from Avigilon. It consists of several multi image 180 and 360 degree cameras on the train platform and...
Wish.com

Wish.com

Wish.com Divisions:W. Bradley Electric, WBE Telcom, WBE SecurityLocation:San Francisco, CADescription:Wish.com is a four phase project which includes a stairwell between the 40th & 41st floors each of which are approximately 20,000 square feet. Our Electrical team...
Petaluma Health Center

Petaluma Health Center

Petaluma Health Center Division:WBE Security Control SystemsLocation:Petaluma, CADescription:WBE Security Control Systems successfully installed an integrated access and alarm monitoring system along with a salient video system that utilizes public view monitors. The...
Mozilla

Mozilla

Mozilla  Division:WBE Security Control SystemsLocations:San Francisco, Berlin, Paris, Asia, London, Vancouver, New ZealandDescription:WBE Security Control Systems has secured work with Mozilla Firefox worldwide. Security installations were completed at seven...