415.898.1400
GAP GSOC

GAP GSOC

GAP GSOC View All Projects PROJECT DETAILS GAP GSOC Albuquerque, NM GSOC Room installation with (2) Pana 105’s mounted side by side with Catalyst V video processor and Canvas software for collaboration capabilities, a Neat Bar Pro camera bar installed above the...
Tipalti

Tipalti

Tipalti View All Projects PROJECT DETAILS Tipalti Foster City, CA 2-floor new tenant renovation in Foster City for a software company. We outfitted all conference rooms with Crestron integrated Zoom Room systems, room scheduling and custom QSYS code scripting for the...
Large Pharmaceutical

Large Pharmaceutical

Large Pharmaceutical PROJECT DETAILS Large Pharmaceutical Bay Area, CACompleted January 2024 Tenant Improvement project upgrading several conference rooms with displays: Poly Video conferencing all-in-one systems, collaboration spaces with DTEN displays for...
Confidential Retail Company

Confidential Retail Company

Confidential Retail Company   Division: Electrical, Telcom, Audio Visual, Security Location: Novato, CA Description: This project was of a remodel of 2 floors in an existing building (41,866 sq ft). Complete tenant improvement including state of the art lighting...
Blue Shield

Blue Shield

Blue Shield Division:WBE Telcom DivisionLocation:Oakland, CADescription:WBE Telcom Division recently completed a project for Blue Shield at their new site located in downtown Oakland. This included installation of Panduit Cat.6A cabling for workstations (4,500 cables)...
Verified by MonsterInsights